Ocean Pride Interior Design and Waterfront Apartment Renovation

Interior design by D-8 Limited for a residential home at Ocean Pride, 100 Tai Ho Road, Tsuen Wan West. The project approach connects space planning, sea-view preservation, custom storage, lighting, materials and building services to create a practical modern home beside the waterfront.

Explore the Ocean Pride property facts, sea-view planning strategy, waterfront material guidance, one- to four-bedroom planning, renovation quotation checklist and .

Project Ocean Pride
Chinese Name
Category Residential Interior Design
Location Tsuen Wan West
Address 100 Tai Ho Road
Phase Phase 3
Towers Towers 6–10
Phase 3 Homes 970 units
Published Size Range 370–1,149 sq. ft. saleable
Published Layouts One to Four Bedrooms

A Waterfront Home Planned Around View, Light and Daily Life

Ocean Pride is the English name generally associated with Phase 3 of the residential development at 100 Tai Ho Road, Tsuen Wan West. Phase 3 comprises Towers 6 to 10 and provides 970 apartments with published layouts ranging from one to four bedrooms and saleable areas of approximately 370 to 1,149 square feet.

The wider two-phase estate also includes Ocean Supreme. When both phases and their tower wings are counted together, public property records commonly describe 14 towers or tower wings and 2,406 residential units. This page focuses on Ocean Pride Phase 3 rather than treating every flat in both phases as identical.

Waterfront apartment design requires more than a blue or neutral colour palette. The layout must preserve useful views while controlling glare, protect access to windows and balcony doors, coordinate air conditioning and curtains, and provide materials and hardware suited to Hong Kong's humid environment.

D-8 Limited develops the interior as one coordinated system. Furniture, electrical points, ceiling features, lighting, material junctions, storage and maintenance access are considered together. Animation visualization can help the owner understand scale, sightlines and circulation before construction begins.

About Ocean Pride at 100 Tai Ho Road, Tsuen Wan West

Ocean Pride Phase 3 facts

  • English development name: Ocean Pride
  • Chinese development name:
  • Development phase: Phase 3
  • Address: 100 Tai Ho Road, Tsuen Wan West, New Territories
  • Residential buildings: Towers 6, 7, 8, 9 and 10
  • Number of Phase 3 homes: 970
  • Published saleable-area range: Approximately 370 to 1,149 square feet
  • Published layouts: One-bedroom to four-bedroom apartments
  • Occupation commenced in 2018
  • Development parties commonly identified in property records: MTR Corporation and Cheung Kong Property group
  • Primary One Admission school net: 62
  • Secondary-school allocation district: Tsuen Wan

Ocean Pride and Ocean Supreme

Ocean Pride Phase 3 and Ocean Supreme Phase 3A form the wider residential estate at the same Tai Ho Road address. Public estate summaries commonly identify a combined total of 2,406 homes across two phases, with saleable areas extending from approximately 370 to 1,163 square feet.

Owners should always state the exact phase, tower, floor and flat letter when requesting design or construction work. A Phase 3 Ocean Pride floor plan should not be assumed to match an Ocean Supreme apartment with a similar bedroom count.

Railway and retail connection

The development is integrated with the Tsuen Wan West transport and retail environment. This improves daily convenience, but renovation logistics still require advance coordination with building management for deliveries, loading, lift protection, worker access and waste removal.

Why the exact floor plan matters

The development includes a broad range of one- to four-bedroom homes. Window width, balcony arrangement, structural walls, kitchen services, corridor length and room proportions differ by tower and flat. The design must therefore be based on the approved floor plan and a measured site survey.

What Matters Most in an Ocean Pride Renovation

Preserve the strongest sightline

Identify the principal visual route from the entrance and living room toward the windows or balcony. Full-height storage, partitions and oversized furniture should not interrupt this route unless there is a clear functional reason.

Control daylight without losing the outlook

Large windows can deliver valuable daylight but may also create glare, reflection and uneven heat gain. Window treatment should be designed with the room, not added after the furniture and ceiling are complete.

Use storage to support the layout

Storage should remove clutter from important visual zones. Tall cabinetry works best on suitable solid walls, while lower furniture near the windows can preserve depth and maintain access to glazing and balcony doors.

Coordinate air conditioning and curtains

Air outlets, return paths, curtain pockets, tracks and cabinet tops can compete for the same ceiling and wall space. Resolve these elements in drawings before construction to avoid blocked airflow or curtains that cannot operate correctly.

Plan for maintenance

Windows, balcony drains, air-conditioning equipment, valves, distribution boards, LED drivers and concealed cisterns require future access. A successful design remains serviceable after the decorative work is finished.

Sea-View Interior Planning Without Glare or Obstruction

Place tall furniture on lower-value walls

Wardrobes, pantries and full-height media storage should normally be concentrated on solid walls away from the main view. This keeps the window wall visually lighter and reduces the risk of blocking natural light.

Use low furniture near glazing

Low benches, movable side tables and slim consoles can provide function near a window without creating a solid visual barrier. The final design must retain safe access to window handles, curtain tracks, sealant and balcony doors.

Position screens to reduce reflection

Televisions and monitors should be positioned perpendicular to the strongest daylight where the floor plan allows. Directly facing bright glazing often increases reflection and encourages residents to close the curtains throughout the day.

Layer the window treatment

A sheer layer can moderate glare and support daytime privacy, while a heavier curtain or blind can provide darkness and additional comfort. Curtain fullness, stacking width, track position and access to balcony doors should be drawn to scale.

Consider changing light conditions

A waterfront outlook changes from bright daylight to reflected sunset and a dark exterior at night. The interior should remain comfortable under each condition, using controllable ambient, task and accent lighting rather than one intense ceiling source.

Use visualization to test the view

An animation walkthrough can test what remains visible after furniture is installed, how the sightline changes from the entrance and dining area, and whether open doors or curtains obstruct the intended outlook. See our Design Project and visualization service.

Humidity, Sunlight, Wind and Material Durability

Moisture-aware cabinetry

Hong Kong's humid conditions can affect composite boards, fabrics, stored clothing and concealed wall surfaces. Cabinet design should include properly sealed cut edges, moisture-appropriate substrates and adequate airflow where conditions require it.

Corrosion-resistant hardware

Hardware selection should consider exposure, usage and cleaning. Hinges, runners, handles, balcony fittings and other metal components should be identified by brand, model and finish rather than described only as standard hardware.

Ventilation behind furniture

Large wardrobes or cabinets placed against external walls may trap moisture if the wall is cool and airflow is poor. Site conditions should be checked before deciding whether a ventilation gap or alternative cabinet arrangement is appropriate.

Light-stable finishes

Strong daylight can fade fabrics, timber tones and coloured surfaces unevenly. Finishes in direct or prolonged sun paths should be assessed for colour stability, while curtains and blinds can reduce unnecessary exposure.

Wind near balcony doors

Strong wind can move curtains, slam internal doors and disturb lightweight objects near openings. Door stops, window hardware, loose furniture and decorative items should be planned with safe operation in mind.

Regular waterfront maintenance

Keep balcony and window drainage points clear, wipe moisture from vulnerable junctions, inspect sealant periodically and clean exposed metalwork using a method suitable for its finish. Do not block drainage or façade access with permanent cabinetry.

For another property-specific waterfront design guide, see our Marine View coastal apartment case study.

Planning Ocean Pride One- to Four-Bedroom Homes

One-bedroom apartment

A one-bedroom home should keep the living room flexible while preventing the bedroom wardrobe from becoming the only storage area. Entrance storage, pantry space, media equipment, cleaning tools and luggage should each have a planned location.

A compact dining table can support meals and occasional computer work if there is adequate knee clearance, nearby power and task lighting. Furniture should not narrow access to the bedroom, kitchen or balcony.

Two-bedroom apartment

The second bedroom may function as a child's room, study, guest room or hybrid space. Its design should follow the actual user rather than a generic bedroom label. If the function may change, modular furniture can preserve future flexibility.

The primary bedroom should provide realistic bed access and measured hanging storage. Overbuilding cabinetry in both bedrooms can reduce circulation without solving household storage for luggage, cleaning equipment or pantry goods.

Three-bedroom apartment

A three-bedroom home benefits from a clear separation between private rooms and communal storage. Household supplies, documents, sports equipment and travel items should not automatically occupy bedroom wardrobes.

The living and dining zones should accommodate the household at full occupancy. Draw the dining chairs in their pulled-out position and confirm the circulation route when cabinet doors or balcony doors are open.

Four-bedroom apartment

A larger home may support a primary suite, children's rooms, guest accommodation or a dedicated study. The design should coordinate multiple wardrobes, bathroom storage, family dining, media equipment and utility functions without creating unrelated cabinetry on every wall.

Larger apartments also require careful electrical and air-conditioning coordination because the number of rooms and fixed appliances can increase substantially. Prepare an appliance and equipment schedule before finalizing circuits and ceilings.

Never design from bedroom count alone

Homes with the same bedroom count can have different structural walls, views, balcony arrangements and service locations. D-8 Limited uses measured dimensions and the specific flat plan before developing detailed joinery or construction information.

A View-Facing Living Room With Practical Storage

Define the focal point

The sea view, television wall and social seating arrangement should not compete unnecessarily. Establish which element is the main focal point and arrange the sofa, dining table and lighting accordingly.

Size furniture from the plan

Use the actual dimensions of the sofa, table, chairs and media equipment. Show the furniture in use, including pulled-out dining chairs, open drawers and circulation around occupied seating.

Integrate media equipment

A media cabinet should provide ventilation and cable access for routers, television equipment, game consoles and adapters. Removable access is more useful than permanently concealing every cable behind decorative panels.

Create flexible dining

An extendable dining table can support visitors while remaining compact during daily use. Check the extended table size, chair positions and route to the kitchen before selecting the mechanism.

Avoid excessive overhead storage

Cabinets above the television or sofa may create visual weight and reduce the sense of openness. If high-level storage is required, align the panels carefully and reserve it for low-frequency items.

Plan evening atmosphere

At night, the exterior view becomes darker and internal reflections appear on the glazing. Layered lighting and controlled brightness can make the room comfortable while reducing harsh reflections.

Kitchen Storage, Appliances and Ventilation

Confirm the approved configuration

Obtain the approved flat plan and current management renovation rules before altering kitchen partitions, doors, ventilation, gas, electrical services, drainage or fire-safety provisions. A design proposal must respect both statutory and building-specific requirements.

Select appliances before cabinetry

Confirm the refrigerator, cooking appliance, extractor, oven, microwave, dishwasher and any washer or dryer that affects the kitchen. Record dimensions, door movement, power, ventilation gaps, water supply and drainage before fabrication.

Protect preparation space

Appliances placed permanently on the worktop can remove much of the food-preparation area. Allocate locations for kettles, rice cookers, coffee machines and other frequently used equipment while retaining a continuous working surface.

Use accessible lower storage

Full-extension drawers generally improve access to cookware and dry goods compared with deep, low cupboards. Internal organizers should match the resident's real inventory and remain adjustable where practical.

Provide task lighting

Ceiling lighting alone can leave the worktop in shadow. Under-cabinet lighting should be coordinated with cabinet depth, switches, drivers, splashback details and future maintenance access.

Control odour and grease

Extraction performance depends on the approved system, hood width, duct arrangement, airflow and filter maintenance. Air conditioning does not replace proper kitchen extraction.

Choose cleanable finishes

Cabinet fronts, worktops, splashbacks, grout and sealant should tolerate realistic cooking and cleaning. Decorative junctions near water and heat need durable detailing rather than appearance alone.

Bed Access, Wardrobes and Private-Room Comfort

Confirm the complete bed size

Use the full dimensions of the bed frame and headboard, not only the nominal mattress. Upholstered edges, storage mechanisms and bedside components can significantly change the remaining aisle.

Select wardrobe doors by clearance

Hinged doors provide full access but require opening space. Sliding doors reduce the opening zone but overlap part of the wardrobe. The correct solution depends on aisle width, internal fittings and how the resident uses the room.

Organize wardrobes by inventory

Measure long hanging, short hanging, folded clothing, drawers, accessories and luggage. Standard equal-width compartments may waste space if they do not reflect the resident's belongings.

Coordinate bedside power

Provide accessible charging, reading lights and switching at the side used by each resident. Avoid placing sockets behind a fixed bed frame where they cannot be reached safely.

Control daylight and privacy

Bedroom curtains should support sleep, daytime privacy and access to windows or balcony doors. Curtain stacking space should be included in the measured design so the fabric does not cover more glazing than expected.

Consider acoustic comfort

Soft furnishings, curtains, upholstered elements and properly sealed doors can improve perceived comfort, but they should be selected with ventilation, cleaning and fire-safety considerations in mind.

Custom Storage Designed From a Household Inventory

Custom furniture can improve fit and reduce unused gaps, but every cabinet should have a defined purpose. The best result balances capacity with circulation, daylight, ventilation and maintenance.

Complete a storage audit

Count clothing, shoes, bedding, luggage, documents, toys, sports equipment, cleaning tools, pantry goods, tableware and appliances. Assign each category to a suitable location before drawing cabinet elevations.

Use different cabinet depths

Hanging clothes and luggage require deeper storage than books, documents or toiletries. Using one full wardrobe depth everywhere can unnecessarily reduce corridors and room width.

Reserve high storage for low-frequency items

Upper cabinets work best for seasonal bedding, suitcases and rarely used items. Frequently used belongings should remain within comfortable reach. The household should also have a safe place to store a step stool if required.

Protect external walls and airflow

Before covering an external wall with full-height furniture, inspect it for moisture and determine whether ventilation or a service gap is needed. Cabinetry should not conceal an unresolved water or condensation issue.

Retain service access

Do not permanently cover electrical distribution boards, valves, air-conditioning access, window fittings or drainage points. Use removable panels and document concealed routes.

Specify boards and hardware

The quotation should identify substrate, thickness, backing, finish, edge treatment, hinges, runners, handles, internal fittings and fixing method. See our Custom Made Furniture service.

Waterproofing, Drainage and Laundry Planning

Keep valves and traps accessible

Water valves, basin traps, concealed cisterns and flexible connections require inspection and repair. Decorative panels should remain removable without dismantling unrelated finishes.

Check every door movement

Draw the bathroom door, shower screen, vanity drawers and nearby bedroom or corridor doors in their open positions. Compact clearances that look acceptable on an empty plan may fail in use.

Define waterproofing clearly

If wet-area finishes are removed, the quotation should state substrate preparation, waterproofing system, wall upturns, pipe penetrations and testing requirements. Complete and record the agreed test before covering the waterproofing.

Form correct drainage falls

Finished surfaces should direct water toward the appropriate drain without persistent ponding or unnecessarily steep transitions. Tile setting-out and drain position should be coordinated before installation.

Use moisture-appropriate cabinetry

Bathroom cabinets need sealed edges, suitable substrates and ventilation. Protect cabinet bases from regular floor water and retain access to plumbing connections.

Plan laundry as a complete function

Confirm washer and dryer type, door movement, heat and ventilation requirements, water supply, drainage, detergent storage, laundry baskets and drying equipment. The machine location alone does not complete a usable laundry area.

Layered Lighting for Day and Night

Ambient lighting

General lighting should provide comfortable background brightness without filling the ceiling with unnecessary fittings. Coordinate fixtures with sprinklers, detectors, air-conditioning equipment, curtain tracks and cabinet doors.

Task lighting

Kitchen worktop lights, reading lamps, wardrobe lighting, desk lighting and mirror lights deliver illumination where it is required. This is often more useful than making one central ceiling light excessively bright.

Accent and indirect lighting

Indirect light can maintain visual depth after the exterior becomes dark. LED profiles and drivers should remain replaceable, with accessible wiring and a clearly specified colour temperature.

Glare control

Locate light sources so they do not reflect strongly in televisions, mirrors or large windows. Dimming or separate circuits can help adapt the room to dining, television viewing and late-evening use.

Consistent light colour

Connected living, dining and kitchen spaces benefit from a coordinated colour-temperature strategy. Colour rendering is important where food, materials, artwork, clothing and skin tones need to appear natural.

A Durable Waterfront Material Palette

Reduce unnecessary material changes

A controlled palette can connect the entrance, living room, dining area and corridor. Too many unrelated finishes can visually divide the apartment and make future maintenance more difficult.

Review physical samples on site

Material colour changes under direct sun, reflected daylight, cloud cover and warm artificial lighting. Review actual samples in the apartment at different times before approving large areas.

Seal vulnerable edges

Composite boards are vulnerable at untreated cut edges and service openings. Edge treatment and penetrations should be detailed, especially near floors, windows, kitchens and bathrooms.

Use suitable hardware

Hinges, drawer runners and handles should match the door size, loading, use frequency and environmental conditions. Hardware quality should be stated in the quotation rather than left undefined.

Design cleanable junctions

Worktop edges, splashbacks, cabinet bases, bathroom vanities, skirtings and door frames should be easy to clean without trapping water or dirt.

Plan for future replacement

Sealant, appliances, LED drivers, filters and moving hardware will eventually need maintenance. Durable design allows these components to be replaced without destroying surrounding finishes.

Electrical, Data and Air-Conditioning Coordination

Prepare an equipment schedule

List all air conditioners, kitchen appliances, water heaters, laundry equipment, dehumidifiers, televisions, routers, computers and charging requirements. The electrical design should be based on actual equipment rather than assumptions.

Place sockets where they remain accessible

Sockets should be clear of water, heat, moving doors and fixed furniture. Avoid positioning essential outlets behind a bed, appliance or permanent cabinet where plugs cannot be reached.

Coordinate network equipment

Router placement should consider incoming service, power, ventilation, wired-data connections and wireless coverage. A fully enclosed cabinet may reduce heat dissipation and signal performance.

Protect air-conditioning airflow

Cabinets, curtains and decorative ceiling features must not obstruct supply or return paths. Provide maintenance access to filters, drains, isolators and service panels.

Record concealed services

Photograph cables, water pipes, drainage and air-conditioning routes before they are covered. Add dimensions or reference points where practical to reduce future drilling risk.

Complete required testing

Fixed electrical work should be carried out, tested and certified by appropriately registered personnel. Water, drainage and air-conditioning systems should also be operationally tested before handover.

Renovation Planning in a Large Integrated Development

Obtain current management rules

Confirm renovation deposits, insurance, contractor registration, working hours, noisy-work restrictions, lift bookings, protection standards and waste-removal arrangements. Requirements may change, so owners should obtain the current version directly from management.

Survey the delivery route

Measure loading access, corridors, lift doors, lift car, tower entrance and flat entrance before ordering oversized furniture, stone or glass. Product dimensions must include packaging and turning clearance.

Book deliveries in sequence

Coordinate material delivery with the construction programme to avoid storing excessive boards, tiles or appliances inside the flat. Congested storage can damage finishes and reduce safe working space.

Protect all common areas

Protection may be required from the approved loading point through the lift and corridor to the flat. The quotation should identify who installs, maintains and removes this protection.

Plan waste removal

Construction debris, packaging and old fixtures must follow management and legal disposal requirements. Do not assume that domestic refuse facilities can accept renovation waste.

Keep approvals and records

Retain management submissions, approved drawings, insurance, test records, variation orders and handover documents. Clear records reduce disputes and support later maintenance.

From Ocean Pride Site Survey to Handover

1. Household requirements

Record family members, routines, working arrangements, cooking habits, storage inventory, preferred materials, budget range and target dates.

2. Property and management review

Confirm the phase, tower, floor, flat letter, approved plan and current management requirements. Identify any restrictions affecting kitchen, bathroom, balcony, façade or building services.

3. Measured site survey

Measure walls, windows, doorways, ceiling heights, beams, floor variation and service points. Record existing finishes and any visible moisture, drainage or defect concerns.

4. Layout options

Test furniture, circulation, sightlines, storage volume and door operation using real dimensions. Compare alternatives before committing to fixed construction.

5. Design development

Develop elevations, cabinetry, ceilings, lighting, electrical points, materials and details. Coordinate the view, curtains, air conditioning and media equipment.

6. Visualization

Use perspective images or animation visualization to review scale, material balance and what the resident will see while moving through the apartment.

7. Itemized quotation

Define protection, demolition, services, finishes, furniture, hardware, installation, testing, exclusions, provisional sums and payment stages.

8. Construction

Complete protection, demolition, first-fix services, substrate preparation, ceilings, finishes, cabinetry and final fixtures in the correct sequence. Inspect concealed work before closing it.

9. Testing and handover

Test all moving parts, electrical equipment, water supply, drainage, air conditioning and appliances. Complete snagging and provide the agreed records and warranty information.

Learn more about our complete Design & Build process.

What an Ocean Pride Renovation Quotation Should Include

Preliminaries

  • Management submission and coordination
  • Insurance and required contractor documents
  • Common-area and internal protection
  • Delivery, handling and lift booking
  • Waste removal and final cleaning

Construction work

  • Demolition and disposal
  • Masonry, plastering and floor preparation
  • Electrical, lighting and data work
  • Water-supply and drainage work
  • Waterproofing and testing where applicable
  • Ceilings, painting and decorative finishes
  • Doors, glass, metalwork and sealant
  • Custom cabinetry, backing and hardware
  • Fixtures, appliances and accessory installation
  • Testing, snagging and defect rectification

Material information

  • Brand, model, dimensions and finish
  • Board type, thickness and edge treatment
  • Hinge and drawer-runner specifications
  • Lighting output, colour temperature and driver access
  • Tile, grout, sealant and waterproofing assumptions

Commercial information

  • Measurement or quantity basis
  • Clearly identified provisional sums
  • Exclusions and owner-supplied items
  • Variation procedure and agreed unit rates
  • Payment stages linked to work progress
  • Estimated programme and material lead times
  • Defects-liability and warranty terms

Use the D-8 Limited quotation form to send the floor plan, site photographs and project requirements.

Ocean Pride Inspection and Handover Checklist

Windows, balcony and view-facing areas

  • Operate windows and balcony doors
  • Check locks, handles and drainage openings
  • Confirm curtains do not obstruct doors or air conditioning
  • Check cabinets retain access to windows and façade junctions
  • Inspect completed sealant and visible finishes

Custom furniture

  • Open every door, drawer and lifting mechanism
  • Check alignment, clearances and soft-close operation
  • Confirm internal fittings match the approved design
  • Inspect sealed board edges and exposed junctions
  • Confirm access panels remain removable

Electrical and lighting

  • Test every switch, socket and fixed connection
  • Check circuit identification and safety devices
  • Verify lighting colour and dimming operation
  • Confirm access to LED drivers and transformers
  • Collect required electrical completion records

Water, drainage and air conditioning

  • Run water fixtures individually and simultaneously
  • Inspect connections and cabinets for leakage
  • Check drainage for persistent ponding or blockage
  • Run each air-conditioning unit
  • Confirm condensate drains correctly

Recommended handover documents

  • As-built drawings where included
  • Final material and hardware schedule
  • Concealed-services photographs
  • Electrical and testing documents
  • Waterproofing records where applicable
  • Appliance manuals and warranties
  • Spare paint, tiles, hardware and sealant
  • Defect-reporting contact and warranty terms

Ocean Pride Interior Design FAQ

Ocean Pride, known in Chinese as , is located at 100 Tai Ho Road, Tsuen Wan West, New Territories. See the property information.
Ocean Pride generally refers to Phase 3, Towers 6 to 10, containing 970 homes. The wider estate also includes Ocean Supreme Phase 3A and is commonly recorded as containing 2,406 homes across both phases.
Published information identifies saleable areas of approximately 370 to 1,149 square feet, with one-bedroom to four-bedroom layouts. The exact tower and flat plan must be confirmed before design.
Keep tall furniture away from the principal view, use lower furniture near the windows, retain access to glazing and balcony doors, position screens to reduce reflection and coordinate layered curtains with air conditioning. See sea-view planning.
Use durable, cleanable finishes, properly sealed board edges, moisture-appropriate substrates and hardware suited to the exposure and loading. Preserve ventilation and maintenance access. See the waterfront environment guide.
Yes. Custom furniture can use walls and recesses more efficiently, but it must preserve circulation, daylight, balcony access, airflow, electrical access and future maintenance. See custom storage planning.
Obtain the approved plan and current management rules, then confirm restrictions involving partitions, doors, ventilation, gas, electrical work, drainage and fire-safety provisions. See the kitchen design section.
Duration depends on apartment size, work scope, management approval, custom-furniture production, material lead times and concealed conditions. A reliable project-specific programme should be prepared after survey, design and quotation.
It should identify protection, demolition, electrical work, plumbing, waterproofing where applicable, ceilings, finishes, cabinetry, hardware, installation, testing, disposal, exclusions, provisional sums, payment stages and warranty terms. See the quotation checklist.
Depending on the agreed scope, the handover pack may include as-built drawings, material schedules, concealed-services photographs, electrical records, waterproofing records, appliance warranties, spare finishes and a defect-reporting procedure. See the handover checklist.
Provide the phase, tower, floor, flat letter, floor plan, site photographs, household requirements, storage inventory, appliance list, budget range and target dates. Call 9135 3998, email enquiry@designd8.com, or use the quotation form.

Request an Ocean Pride Interior Design Quotation

Send the phase, tower, floor, flat letter, floor plan, current-condition photographs, household requirements, appliance list, storage inventory, budget range and target dates. D-8 Limited can review the information, arrange a site visit and prepare a written itemized quotation based on the actual scope.

Call 9135 3998 or email enquiry@designd8.com.

Get a Quote Back to Portfolio
WhatsApp