The Parkside — Park-Facing Family Interior Design in Tseung Kwan O
An open view is an asset only if the layout protects it. This project focuses on sightlines, daylight, glare control, high-ceiling storage and adaptable family rooms.
See the view-planning method, layout strategies, or request a quotation.
Interior design project by D-8 Limited at The Parkside, Hong Kong.
D-8 Limited is an integrated design firm on interior design. It emphasizes on details in its design philosophy, which could be reflected on both the user experience and form of its works. As an evolving design studio, it offers animation visualization as an advanced presentation tool for their client to easily understand the design and outcome in a more comprehensive way.
The value of an open outlook is easily lost through poor furniture placement. A full-height cabinet beside the main window, a television directly opposite strong daylight or a dining table blocking the balcony route can make a well-oriented flat feel smaller than an inward-facing one. This case study begins with what the windows, sightlines and sun are already providing, then adds storage and family functions around them.
About The Parkside, Tseung Kwan O
The Parkside is at 18 Tong Chun Street in Tseung Kwan O Town Centre. It was developed by Wheelock Properties, with an occupation permit dated 18 December 2015, and sits within walking distance of Tseung Kwan O MTR station.
Estate facts
- 591 residential units
- Occupation from December 2015
- Saleable areas approximately 386 to 1,570 square feet
- Layouts from one to four bedrooms
- Two and three bedroom flats form the principal unit mix
- Seven special units in the original development mix
- Clubhouse and swimming-pool facilities
- Approximately four to five minutes' walk from Tseung Kwan O MTR station
- Primary One Admission school net 95
- Secondary allocation in Sai Kung District
Three towers or five blocks?
Original sales information describes three residential towers, while several estate databases count the individual sub-towers or component buildings separately and display five blocks. Both figures refer to the same 591-unit development. For renovation work, the important identifiers are the exact tower, floor and flat letter.
Published height range
First-sale information indicates stated floor-to-floor or ceiling-height figures of approximately 3.15 to 4.1 metres depending on unit type. This does not mean every room has 4.1 metres of finished clear height: bulkheads, structural beams, air conditioning and ceiling construction reduce local height. The specific flat must be measured before any high cabinet, feature ceiling or platform is designed.
Design Around the View, Not in Front of It
1. Map the view and the sun path
Record which windows provide the principal open view, when direct sun reaches each room and where glare affects television screens, computer monitors and reflective finishes. A view-facing flat changes character throughout the day, and one daytime visit is not enough to understand it.
2. Protect the longest sightline
Stand at the entrance and identify the longest uninterrupted line toward the windows. Keep tall cabinets, full-height partitions and bulky furniture out of that visual corridor.
3. Put high storage on solid walls
Use full-height cabinetry on the least valuable solid wall rather than wrapping the window wall with storage. Low cabinets may sit near glazing where they do not obstruct the view, drainage or window operation.
4. Place screens perpendicular to daylight
Televisions and computer monitors generally perform better at right angles to the strongest window than directly opposite it. This reduces glare without relying on blackout curtains throughout the day.
5. Use layered window treatment
Sheer curtains control privacy and soften daylight; blackout curtains support bedrooms and media use; solar blinds can reduce glare while retaining part of the view. Tracks and pockets should be coordinated with the ceiling and joinery before construction.
6. Keep balcony and window access clear
Furniture, curtains and cabinetry must not obstruct door operation, drainage, window handles or the route to outdoor space.
7. Test the plan through animation
An animation walkthrough shows what is visible on entering the flat, whether the view survives the furniture arrangement, whether doors clear one another and whether circulation remains open when the dining table is extended. See our visualization guide.
Control Light Without Closing the Flat
Strong daylight is not always comfortable daylight
Direct sun can produce glare, uneven temperature and fading of timber, fabrics and artwork. The solution is to control it in layers rather than blocking it completely.
Furniture placement
Avoid placing a work desk or television directly opposite the brightest opening. Where the plan does not permit another position, specify an effective solar blind or layered curtain treatment and avoid high-gloss finishes that amplify reflections.
Light-stable materials
Finishes in the direct sun path should be selected for light stability. Timber veneer, coloured fabrics and some laminates may change unevenly where part of the surface is shaded by furniture or curtains.
Indirect lighting after sunset
An open-view flat can become visually dark after the exterior turns black. Indirect cove light, wall washing and task lighting create depth without replacing daylight with a grid of harsh downlights.
Curtain pockets
A recessed curtain pocket keeps tracks out of sight and allows sheer and blackout layers to operate independently. It must be coordinated with air conditioning, sprinkler positions and ceiling bulkheads before work begins.
Use the Height Without Overbuilding the Flat
Measure the finished height
Published development figures may range from approximately 3.15 to 4.1 metres depending on unit type, but the actual finished clear height varies by room and location. Measure structural beams, bulkheads, ceiling zones, curtain pockets and air-conditioning routes before drawing cabinetry.
Separate top boxes
A full-height wardrobe can use the volume above standard reach for luggage and seasonal bedding. The top compartment should have separate doors rather than extending one oversized door upward, which reduces the risk of warping and makes alignment easier.
Daily items below easy reach
Anything above approximately 2,100 millimetres normally requires a step. Store seasonal and lightweight items there, not daily clothing or heavy luggage that must be handled frequently.
Do not lower the entire ceiling without reason
Use local bulkheads where services require them and keep the remaining ceiling high. A full false ceiling may hide services neatly but can remove one of the development's strongest spatial assets.
High ceilings and acoustics
Greater room volume may increase reverberation where floors, walls and cabinet fronts are all hard. Curtains, upholstered furniture, rugs and selected acoustic surfaces can soften sound without changing the visual simplicity of the room.
Planning From One Bedroom to Four Bedrooms
One bedroom, approximately 386 square feet and above
Use one full-height storage wall, a clear entrance cabinet, an efficient kitchen and a genuine work position where required. Keep the principal window wall open and avoid using several shallow decorative cabinets that divide the room visually.
Two bedroom units
The primary bedroom takes the main wardrobe. The second room should have one primary function but remain reversible: child's room, study or guest room. Platform beds provide storage but create a permanent level change; an integrated desk and wardrobe may preserve greater flexibility.
Three bedroom family units
Provide a primary wardrobe, family entrance storage, utility cabinet, one study-capable bedroom and an efficient kitchen. The third room often needs to alternate between study and guest use, making a convertible desk, sofa bed or wall bed more useful than a permanent single-purpose layout.
Four bedroom and larger units
A dressing run, dedicated study and complete laundry or utility provision become viable. The fourth bedroom may become a helper's room, guest room or family store, but ventilation and access to services must remain available.
Special units
Special units may have different ceilings, terraces, platforms or unusual external relationships. Their design must begin with the actual title, floor plan, approved configuration and measured dimensions, not the standard tower plan.
Children, Study, Storage and Work From Home
Children's bedrooms
Fix the cabinet carcass and power points but keep internal shelving, hanging rails and desk components adjustable. Use anti-tip fixings on tall units, soft-close hardware and rounded edges at child height. Avoid low-level glass.
Homework wall
Provide a real desk depth, task lighting, sockets and data at the work surface, adjustable shelving above and closed storage below. In a family flat, homework may take place in the living area rather than behind a bedroom door, so the work wall should read as furniture rather than office equipment.
Family entrance storage
Separate shoes, bags, umbrellas, keys, parcels and sports equipment. A ventilated shoe cabinet plus an open drop shelf removes more daily clutter than a decorative entrance wall.
Utility storage
Vacuum cleaners, drying racks, ironing boards, tools and household supplies require a full-height compartment. They cannot be stored efficiently on normal shallow shelves.
Work-from-home room
A permanent work position needs monitor depth, power, data, storage, task lighting and a suitable video-call background. If the room may later return to bedroom use, keep the desk and shelving modular.
Family joinery reference
See our growth-proof family joinery method and storage-capacity audit for more detailed planning.
Services Must Be Settled Before Cabinet Fabrication
Electrical and data
Confirm every socket, switch, television and data point against the cabinet interiors. Avoid extension leads and visible trunking by resolving actual furniture and appliance locations before first-fix work.
Air conditioning
Indoor-unit locations, condensate falls and maintenance access should be coordinated with the ceiling and tall cabinetry. Never place a fixed cabinet where it blocks a filter or future service panel.
Lighting circuits
Separate ambient, task, accent and cove lighting where appropriate. Place switches at the routes residents actually use and add bedside or secondary control where it improves safety and convenience.
Kitchen equipment
Confirm appliance models before cabinetry is fabricated. Fridge ventilation, dishwasher door clearance, oven height, microwave access and washing-machine maintenance all change the drawing.
Wet areas
If bathroom or kitchen waterproofing is altered, complete and record the flood test before tiling. Verify drainage falls and water connections before cabinets conceal the pipework.
Working in a 591-Unit Managed Development
Application before construction
Submit the works programme, contractor information, insurance details and any required drawings to the management office. Pay the stated deposit and confirm the permitted working hours before setting the site programme.
Lift and delivery bookings
Reserve service lifts early. Consolidate boards, hardware, appliances and lighting into fewer complete deliveries, and size panels against the lift-car dimensions.
Protect common areas
Install approved protection to the lift car, lobby, corridor and unit entrance before materials move. Keep fire exits and neighbouring access clear at all times.
Noise and waste
Group drilling and cutting into the permitted noisy-work periods. Remove packaging and debris through the authorised route rather than accumulating material in common areas.
Deposit return
At completion, clean and inspect the common route with management. Repair any damage before requesting release of the works deposit.
Renovation Timeline
Design and preparation
Measured survey, layout options, visualization, material selection, drawings and itemized quotation commonly require two to four weeks.
Construction
A newer-flat renovation commonly takes six to ten weeks, depending on layout changes, wet-area scope, joinery volume, special-unit conditions, material lead times and estate access.
Typical sequence
- Management approval, protection and limited removal works
- Electrical, data, plumbing and air-conditioning first fix
- Partitions, wet areas and local ceiling work
- Flooring and final joinery measurement
- Joinery fabrication and installation
- Painting, lighting, appliances and fixtures
- Testing, snagging, cleaning and handover
What most often causes delay
- Late room-use or material decisions
- Appliance models selected after cabinets are drawn
- Service-lift bookings during busy renovation periods
- Special glazing, stone, lighting or hardware lead times
- Late electrical changes after cabinet fabrication begins
Statutory works
Non-structural partitions may sometimes be altered after verification. Structural elements require professional assessment and the correct statutory route. Where Class II minor works apply, Form MW03 serves as the notice of commencement and Form MW04 as the certificate of completion. D-8 Limited is a Registered Minor Works Contractor Class II.
Where the Budget Should Go
Recommended priority order
- Developer or existing defect correction
- Electrical, data, air conditioning and lighting coordination
- Kitchen and bathroom work
- Primary wardrobe, entrance and utility storage
- Children's rooms and work-from-home areas
- Curtains, loose furniture and decorative finishes
Spend to protect the view
Good window treatment, screen positioning and low furniture near the main outlook may deliver more value than an expensive decorative wall that obstructs daylight. The design should preserve what the property already offers before adding new objects.
Spend on hardware where use is frequent
Kitchen drawers, primary wardrobes and sliding doors may be operated several times every day. State hinge, runner and track specifications in the quotation rather than accepting generic “soft-close hardware”.
Do not overbuild every room
A family home needs flexibility. Permanent cabinetry should follow measured storage demand, while furniture supporting temporary room uses remains movable or convertible.
Compare any proposal using our itemized quotation checklist and quotation warning signs.
Testing and Handover
Operational inspection
Open and close every cabinet, door and window; test every switch and socket; run every tap, shower, WC and drain; operate every air-conditioning unit and appliance; inspect paint and alignment in daylight and under artificial light.
Electrical certification
Where fixed electrical installations have been repaired, altered or added, obtain the applicable Form WR1 or WR1(A) Work Completion Certificate signed by the registered electrical worker and endorsed by the registered electrical contractor.
Waterproofing and drainage records
Retain flood-test records and photographs where waterproofing was renewed, together with drainage-test information and photographs of concealed pipework.
Handover pack
- As-built drawings
- Finishes and hardware schedule
- Electrical Work Completion Certificate where applicable
- Waterproofing and drainage records
- Minor works submissions where applicable
- Appliance manuals and warranties
- Spare paint, tiles and hardware
- Photographs of concealed services
- Defects warranty terms and care notes
The complete room-by-room snagging process appears on our renovation handover case study.
The Parkside Renovation FAQ
Send the Floor Plan and the View Direction
Those two pieces of information decide where storage, screens, lighting and circulation belong. Free site visit, free measurement and a written itemized quotation.
Call 9135 3998 or email enquiry@designd8.com.
Get a Quote Back to Portfolio