La Splendeur Custom Made Furniture — Family Joinery at LOHAS Park

Growth-proof joinery for three and four bedroom family units at LOHAS Park Phase 2C: adjustable interiors, children's rooms that survive a decade, and store rooms that finally earn their floor area. See the full service, read the ten-year method, or request a quotation.

Custom Made Furniture — Contemporary, Eco Wood Home Furniture

D-8 Limited provides custom made furniture design and manufacturing services. Our contemporary, eco wood home furniture is tailored to fit your space perfectly.

About La Splendeur, LOHAS Park Phase 2C

La Splendeur is Phase 2C of LOHAS Park at 1 Lohas Park Road, Tseung Kwan O, sitting within the Le Prestige development zone C and developed by Cheung Kong with the MTR Corporation directly above the LOHAS Park rail terminus.

Composition and layouts

  • Three residential towers, numbered 9 to 11, rising 57 to 63 storeys
  • 1,168 units in total
  • Floors arranged as three lifts serving three or four units, giving relatively few neighbours per lobby
  • Predominantly three and four bedroom layouts — this is a family estate by design
  • Saleable areas roughly 601 to 1,710 square feet, with commonly transacted sizes around 676, 684, 727, 733, 995 and 1,005 square feet
  • Occupation from around December 2012 into 2013
  • Towers carry painting-derived names such as Bouquet and Almond Blossom in Tower 9, Irises and Flamingos in Tower 10, and Morning in Tower 11
  • Primary One Admission school net 95, secondary allocation in Sai Kung District

What the demographics mean for joinery

Three and four bedroom units in a school-net estate mean one thing: most briefs come from families, and families are moving targets. The unit that needs a cot today needs a homework wall in five years and a proper wardrobe for a teenager in ten. Joinery built only for handover day gets ripped out twice. Everything below is written for the ten-year view.

Growth-Proof Joinery — Fix the Box, Vary the Inside

The single most useful principle in family joinery: permanence belongs to the carcass, flexibility belongs to the interior.

  1. Fix the carcass, the wall positions and the power. Cabinet boxes, wall fixing lines, sockets, data points and lighting switches should be decided once and never moved.
  2. Put everything age-dependent on adjustable systems. Shelf pitch, hanging rail height, desk height, drawer inserts and basket positions all change with the child. Adjustable internals cost a little more now and save a full replacement later.
  3. Design the desk for the tallest future user. Set depth against a real monitor and a real school bag rather than a nominal 600 millimetres, and pair it with a chair that rises rather than a fixed bench.
  4. Choose bed type by ceiling height and age. Platform beds with drawers maximise storage for younger children; loft or high beds free the floor beneath for a desk where height allows.
  5. Specify for safety and cleaning. Anti-tip fixing on every tall unit, soft-close hinges and runners, radiused edges at child height, and finishes that survive repeated wiping without solvent.
  6. Leave one wall unbuilt. A room with a free wall can absorb a second desk, a music stand or a growth spurt in belongings. A room built out on all four walls cannot change without demolition.

Run this alongside the storage audit method we publish on the Grandview Garden case study, and the first quotation you receive will be based on real capacity rather than a nominal cabinet count.

Bedrooms That Work at 5, 12 and 18

Platform bed with drawers

Converts the whole bed footprint into storage, which in a 676 to 733 square foot three bedroom flat is often the only way to house toys, bedding and off-season clothing without stealing wardrobe space. Drawers should be full-extension and load-rated, because children open them harder than adults do.

Loft or high bed with desk beneath

Frees floor area and gives a child a defined study zone, but needs adequate ceiling height, a proper guard rail, and a ladder with rung spacing suited to the actual child rather than a nominal figure. We also plan lighting under the bed platform, since that space receives no ceiling light.

Bunk beds for shared rooms

Where two children share, a built-in bunk with individual reading lights, personal shelf niches and separate drawer banks reduces daily friction more than any amount of floor area. Guard rails and ladder position are safety items, not styling items.

Wardrobe interiors that grow

Start with a lowered hanging rail so a young child can reach their own clothes, on a system that lifts as they grow. Keep folded bays adjustable, and reserve a top box for items the child should not access unaided.

The homework wall

Adjustable shelving above, closed base storage for files and printers, generous power and data, and task lighting positioned so the writing hand does not shadow the page. In many three bedroom flats this wall sits in the living room, so it must read as furniture rather than office equipment.

Materials that tolerate childhood

Scratch-resistant laminate on door faces at kicking height, wipeable finishes throughout, and no low-level glass. Save the delicate veneer or lacquer for the primary bedroom and the living room feature wall.

Three and Four Bedroom Planning, 601 to 1,710 sq ft

Three bedroom, around 676 to 733 sq ft

The most common brief here. Primary bedroom takes a full-height wardrobe run with stacked short-hang and a top box; second bedroom takes a platform bed or loft bed; third bedroom often doubles as study and guest room, which argues for a wall bed or a desk that converts. The entrance needs a ventilated shoe cabinet with a drop shelf, and the living room a TV feature wall that hides router, console and cabling.

Three to four bedroom, around 995 to 1,005 sq ft

Storage stops competing with circulation. A dedicated utility cabinet absorbs vacuum, ironing board and tools; the primary suite can take a bedhead panel with integrated reading light and charging plus matched bedside units; and the kitchen gains a tall larder and appliance housing at working height.

Four bedroom and larger, up to around 1,710 sq ft

A walk-in closet or dressing room becomes viable, with open hanging, drawer banks and shoe shelving at adjustable pitch. A study or library wall earns its own room. Long runs at this scale demand tighter tolerances and batch-matched finishes, since a two millimetre drift compounds visibly across a nine metre wardrobe — which is why final measurement waits until the room is genuinely finished.

The store or helper's room — the highest-value conversion

Fitted floor-to-ceiling shelving turns a small room into a genuine utility store for suitcases, bulk purchases, seasonal decorations, vacuum, ironing board and tools. Done properly it removes the pressure that otherwise pushes those items into bedrooms and onto balconies. Ventilation and access to any services inside the room must be preserved, and a lockable section is worth considering where cleaning chemicals are stored.

Kitchen and utility

Drawer stacks rather than deep base cupboards, a slim pull-out for the awkward 150 to 300 millimetre gap, a tall unit that lifts appliances off the worktop, and hardware rated for the heaviest duty cycle in the home. Where a washer or dryer position exists, a tall cabinet hides the machine along with detergent, mop and bucket.

Installing in a 57 to 63 Storey Tower

In a large rail-integrated development, logistics decide the programme as much as design does. This is the part most quotations never mention and most delays come from.

The lift is the real constraint

Service lift bookings are timed and shared with every other owner renovating that week. Oversized panels may simply not fit the lift car, so components are sized to the lift, pre-assembled in the workshop where possible, and delivered in fewer, fuller trips rather than daily dribbles.

Long haul from loading bay to door

Distance from the loading area through lobbies and corridors adds handling time and raises the risk of damage to common areas. Full protection of lift car, lobby and corridor goes down before the first board arrives.

Competing schedules in a big estate

Thousands of units means many simultaneous renovations, so lift slots, refuse arrangements and permitted hours are genuinely competitive. Booking early and consolidating deliveries is often worth more to the programme than adding labour.

High floor conditions

Higher floors bring stronger wind pressure at openings, greater unobstructed sun exposure, and larger temperature swings against glazing. Finishes in the sun path should be light-stable, curtains and blinds planned as part of the joinery with an integrated pocket, and deep cabinets kept ventilated at the back because condensation behaves differently against a hot or cold facade.

Living in the flat during works

Where the family stays in place, we sequence room by room with daily protection and cleaning so at least the bedrooms remain usable. Because fabrication happens off site, on-site joinery time is measured in days, which makes school holidays a realistic window.

Materials, Finishes and Hardware for Family Use

These line items explain most price differences between quotations, so we list them individually rather than as a lump sum.

  • Carcass board — grade and thickness, with lower-emission eco wood options, which matter more in children's rooms than anywhere else
  • Back panel thickness — carries racking loads on tall units and bunk structures
  • Door finish — scratch-resistant laminate at child height, veneer or lacquer reserved for adult rooms and feature walls
  • Edge banding — the detail that decides whether cabinetry still looks tidy after years of school bags
  • Hinges — soft-close with stated brand and cycle rating, so fingers are protected
  • Drawer runners — full-extension and load-rated, since toy and pot drawers are punished daily
  • Anti-tip fixings — mandatory on every tall unit in a home with children
  • Radiused edges and no low glass — specified at child height as standard
  • Adjustable internals — shelf systems, rail brackets and insert trays that reposition without tools
  • Light-stable finishes — where surfaces sit in strong high-floor daylight
  • Moisture-rated substrate — for vanities, utility cabinets and anything near water

Samples of these boards, laminates and hardware are kept at our Kwun Tong office — worth a visit to slam a hinge and load a drawer before choosing.

From Measurement to Installation

  1. Site visit and first measurement — wall lengths, ceiling height, bulkhead depths, sprinkler and air conditioning positions, window and curtain details, door swings and existing service points.
  2. Family brief and storage audit — ages of children per room, hanging length per person, folded stacks, shoes, suitcases, toys, sports and seasonal items.
  3. Joinery shop drawings — every cabinet drawn with internal divisions, adjustable systems, hardware, finishes and socket coordination before anything is cut.
  4. Finish approval — samples signed off, batch reserved where veneer or lacquer is used.
  5. Final measurement after wet trades — taken once plastering, tiling and levelling are complete, because joinery is cut to the built dimension.
  6. Workshop fabrication — sized to the service lift, pre-assembled where possible.
  7. Booked delivery and installation — lift slots, protection, agreed route, consolidated trips.
  8. Adjustment and handover — alignment, drawer travel, soft-close tension, anti-tip fixing check, then touch-up and cleaning.

The full eight-stage project sequence either side of joinery is on our process section, and the complete drawing set is listed on the Design Project page.

Estate Rules and Compliance

  • Works application — schedule, contractor details, insurance and a refundable deposit
  • Service lift booking — timed slots, often with penalties for overrun
  • Protection standard — lift car, lobby, corridor and unit entrance protected before material enters
  • Permitted hours — noisy operations restricted, shaping the installation sequence
  • Delivery route and waste — agreed route, with packaging and offcuts removed rather than left in common refuse areas
  • Minor works — any alteration to partitions or structural elements falls under the Minor Works Control System and must be carried out by a prescribed registered contractor. D-8 Limited is a Registered Minor Works Contractor Class II; background is in our credentials section

Where the scope extends beyond joinery, we handle these submissions as part of a Design & Build engagement, and structural repair sits under Spalling Repairing Works.

How Family Joinery Is Quoted

Joinery is normally priced per cabinet or per running foot, and it is usually the largest single cost group in a Hong Kong renovation. In a family flat, cost concentrates in the primary wardrobe run, the children's beds with integrated storage, and the kitchen or utility area.

Compare line by line

  • Cabinet count and running length per piece, with the top box itemised separately
  • Board grade, back panel thickness and door finish per item
  • Hinge and runner brand with cycle and load ratings
  • Adjustable internals — included or an extra
  • Anti-tip fixings, guard rails and edge treatment
  • Delivery, lift booking, protection, installation and waste removal
  • Warranty period and what it covers

Phasing around a family

Build first what is hardest to add later — anything needing electrical coordination, the kitchen, the primary wardrobe — then add children's rooms as needs settle. Because on-site time is short, later phases can land inside a school holiday. Our fee models and an 18-point quotation checklist are on the quotation page, with warning signs listed here.

Custom Furniture FAQ

La Splendeur is Phase 2C of LOHAS Park at 1 Lohas Park Road, Tseung Kwan O, within the Le Prestige development zone C, developed by Cheung Kong with the MTR Corporation above LOHAS Park station. Primary school net 95, secondary allocation in Sai Kung District. See the property section.
Three towers numbered 9 to 11, rising 57 to 63 storeys, providing 1,168 units, arranged as three lifts serving three or four units per floor. Layouts are predominantly three and four bedroom, saleable areas roughly 601 to 1,710 square feet, with common transacted sizes around 676, 684, 727, 733, 995 and 1,005 square feet. Occupation began around December 2012 into 2013.
Because the household changes faster than the cabinets. A wardrobe sized for a five year old is wrong at twelve. Fix the carcass, wall positions and power, then keep shelf heights, hanging rails, desk height and drawer inserts on adjustable systems — see growth-proof joinery.
Platform beds with deep drawers convert the bed footprint into storage and suit younger children. Loft or high beds free the floor for a desk but need ceiling height, a guard rail and a comfortable ladder pitch. A standard bed with wardrobe and separate desk is most flexible if the room allows. Details in bedrooms that work at 5, 12 and 18.
Anti-tip fixing of every tall unit to the wall, soft-close hinges and runners, radiused edges at child height, no low-level glass, guard rails on elevated beds, and finishes that tolerate repeated cleaning without solvents.
Yes, and it is often the highest-value joinery in a family flat. Fitted floor-to-ceiling shelving turns it into a genuine utility store for suitcases, bulk purchases, seasonal items, vacuum and tools. Ventilation and access to services inside the room must be preserved — see room by room planning.
Adjustable shelving above, closed base storage below, desk depth set against a real monitor and school bag, generous power and data, and task lighting positioned so the writing hand casts no shadow. In three bedroom flats this wall often sits in the living room, so it must read as furniture.
Logistics dominate. Service lift bookings are timed and shared, the haul from loading bay to unit is long, protection is mandatory, and oversized panels may not fit the lift car. Components are sized to the lift, pre-assembled in the workshop, and delivered in fewer fuller trips — see installing in a tall tower.
Yes. With many units renovating simultaneously, lift slots, refuse arrangements and permitted hours are competitive. Booking early and consolidating deliveries usually helps the programme more than adding labour.
Stronger wind pressure at openings, greater unobstructed sun exposure and larger temperature swings against glazing. Finishes in the sun path should be light-stable, curtains planned with an integrated pocket in the joinery, and deep cabinets ventilated at the back.
Managed estates require a works application with schedule, contractor insurance and a refundable deposit, plus lift booking, protection and controlled waste removal. Any alteration of partitions or structural elements falls under the Minor Works Control System and requires a prescribed registered contractor. D-8 Limited is a Registered Minor Works Contractor Class II — see estate rules and compliance.
Per cabinet or per running foot, driven by board grade, door finish, internal fittings and hardware. Cost concentrates in the primary wardrobe run, children's beds with integrated storage, and the kitchen or utility area. Adjustable internals cost slightly more now and save a replacement later — compare with the 18-point checklist.
Yes. Fabrication happens in the workshop, so on-site time is short and can be scheduled into holidays. Where the family lives in the flat, we sequence room by room with protection and daily cleaning so bedrooms stay usable.
Send the floor plan with tower and flat letter, the ages of children using each room, and a list of what needs storing, then book a free site visit. We measure, discuss the brief and issue a written itemized quotation before any commitment. Call 9135 3998, email enquiry@designd8.com or use the quotation form.

Building for the Next Ten Years?

Tell us the ages, not just the areas. Free site visit, free measurement, written itemized quotation. Call 9135 3998 or email enquiry@designd8.com.

Get a Quote Custom Made Furniture
WhatsApp