Harbour Glory Custom Made Furniture — New Handover Joinery in North Point

Contemporary eco wood joinery for a 2019 handover apartment at 32 City Garden Road, where the work is not demolition but precision: building against finished floors, installed kitchens and high ceilings. See the full service, read the handover sequence, or request a quotation.

Custom Made Furniture — Contemporary, Eco Wood Home Furniture

D-8 Limited provides custom made furniture design and manufacturing services. Our contemporary, eco wood home furniture is tailored to fit your space perfectly.

About Harbour Glory, North Point

Harbour Glory stands at 32 City Garden Road in North Point, within the Eastern District of Hong Kong Island, on the Victoria Harbour waterfront roughly a block from Fortress Hill MTR station — about a five minute walk, with King's Road immediately behind for buses and trams. It was developed by CK Asset, and the occupation permit is dated 11 June 2019.

Composition and layouts

  • Six residential towers, numbered 1 to 8 with 4 omitted, and Tower 2 forming the hotel component
  • 378 residential units in total
  • Blocks of 33 to 37 storeys, with two to five units per floor — Block 6 carries five
  • Saleable areas from 432 to 1,595 square feet, in one to four bedroom layouts
  • A hotel component of roughly 330,000 square feet providing about 800 rooms
  • Primary One Admission school net 14, secondary allocation in Eastern District

Why the 2019 completion date drives everything

A building this recent hands over with finished floors, finished skirting, installed doors, installed kitchen cabinets, worktops, sanitary ware and appliances. There is nothing to demolish and nothing structural to negotiate. What replaces demolition is discipline: match or deliberately contrast the existing palette, protect every surface you did not install, and place cabinets against a shell that is already square and level — which raises expectations of the joinery, not lowers them.

The Handover Fit-Out Sequence

Owners of new units lose money in two predictable ways: starting work before the defects inspection is documented, and starting work before the management office's fit-out rules are known. Both are avoidable.

  1. Complete the defects inspection first. Walk the unit with the developer's checklist and log every scratch, hollow tile, misaligned door and appliance fault in writing, with photographs and dates, before any contractor enters. After that point, responsibility for a mark on the floor is arguable — before it, it is not.
  2. Collect the fit-out rules. Works application forms, permitted working hours, service lift booking procedure, deposit amount, insurance requirements, delivery routes and protection standards. These shape the installation programme.
  3. Record the developer specification. Floor finish and direction, skirting profile and height, door and architrave finish, kitchen cabinet colour and handle type, worktop material, sanitary ware, appliance models and their service clearances.
  4. Measure the vertical dimension properly. Finished ceiling height, bulkhead depths, sprinkler head positions, air conditioning units and drainage routes, window head heights and existing curtain provisions. These decide the top box, the curtain pocket and the maximum cabinet height.
  5. Run the storage audit. Count hanging length per person, folded stacks, shoes, suitcases and bulky seasonal items, so capacity is designed from real numbers.
  6. Protect before you build. Full floor protection, wrapped door frames, protected lift lobby and corridor, agreed delivery route.
  7. Install, adjust, hand back. Joinery installation, then curtains and blinds, then alignment and soft-close adjustment, then cleaning and a joint walkthrough.

Fitting out before move-in is materially cheaper than doing it afterwards, because no furniture needs shifting and no household needs protecting. The full eight-stage project sequence is on our process section.

Working With Developer-Installed Finishes

Match closely or contrast clearly — never in between

A near-miss on timber tone or white shade reads as a mistake; a deliberate contrast reads as a design decision. When existing doors and skirting are a specific white or oak, we either source to that reference or move decisively to a different family and tie the scheme together with a shared accent, hardware finish or stone.

Floors decide the base detail

Because the floor is already laid, cabinets must either sit on the finished floor with a matching plinth, or land against existing skirting with a scribed filler. Cutting into a new floor to recess a cabinet is rarely worth the risk, and never worth it if the floor is under warranty.

Installed kitchens can be extended rather than replaced

A developer kitchen usually has a coherent door finish and worktop but limited storage. Adding a tall larder unit, a slim pull-out in the awkward gap, an appliance housing at working height or an island-side storage bench often delivers more usable capacity than tearing out serviceable cabinetry — and keeps the appliance warranties intact.

Services and fixings

Fixing positions are planned away from concealed services, sprinkler pipework and air conditioning drainage. Where a television or monitor wall is required, power and data are coordinated before boards are cut, because a socket 40 millimetres out can render a shelf unusable or force visible trunking.

Curtains and blinds belong in the joinery drawing

A curtain pocket integrated into the ceiling line or the top of a cabinet run keeps sightlines clean and hides the track completely. Deciding this after joinery is installed usually means a surface-mounted track and a compromised ceiling detail.

Making Use of a Taller Ceiling

Generous ceiling height is the most under-exploited asset in a premium new flat. It converts into storage, light quality and perceived volume — but only if planned before boards are cut.

The top box

Above the standard wardrobe height sits the cheapest storage volume in any home. It is ideal for suitcases, seasonal bedding, festive items and archives. Because anything above roughly 2,100 millimetres needs a step to reach, it should never hold daily items, and doors up there are better hinged than sliding for full access.

Concealed lighting and the cove

A taller ceiling allows an indirect cove above the wardrobe line or along the living room perimeter, which lifts the whole room without adding downlights. In a harbour-facing flat this matters in the evening, when the view goes dark and the room needs its own light rather than borrowed daylight.

Taller kitchen and utility units

Full-height larders and stacked appliance towers become possible, moving the microwave and steam oven to working height and clearing the worktop entirely.

Where extra height hurts

Very tall single doors can warp and sag over time, so long runs are better divided into a base cabinet plus a separate top box with its own doors. It is a structural decision disguised as an aesthetic one.

Joinery by Unit Size, 432 to 1,595 sq ft

Harbour Glory spans a wide range of layouts, and the same joinery vocabulary behaves differently at each end.

One bedroom, around 432 to 500 sq ft

Everything hangs on one decision: which wall becomes storage. Full-height run on the longest uninterrupted wall, entrance shoe cabinet with a drop shelf, a TV feature wall concealing router and equipment, and either a platform bed with deep drawers or a wardrobe with a top box. Sliding doors where the bed sits close. Keep the rest loose so the plan can adapt as life does.

Two bedroom, around 530 to 620 sq ft

The primary bedroom takes a full wardrobe run with stacked short-hang; the second room takes one of three options — platform bed, high bed with desk beneath, or desk integrated into the wardrobe run. A slim console or wall-fixed bench keeps the dining zone workable.

Three bedroom, around 850 to 1,050 sq ft

Storage stops fighting circulation. A dedicated utility cabinet absorbs vacuum, ironing board and tools, the entrance gains a proper drop zone, and the primary suite can take a bedhead panel with integrated lighting and charging plus matched bedside units.

Four bedroom, around 1,300 to 1,595 sq ft

A walk-in closet or dressing room becomes viable, with open hanging, drawer banks, shoe shelving at adjustable pitch and possibly an island or bench. Add a study or library wall with adjustable shelving and concealed cable routes, and a laundry or utility area with a sorting bench. At this scale, batch-matched finishes and tight tolerances matter: a two millimetre drift compounds visibly across a nine metre run, which is why final measurement waits until the room is genuinely finished.

Designing for a Harbour-Facing Flat

Light stability of finishes

Strong, sustained daylight fades timber veneer and some laminates unevenly, most visibly where a rug or a sofa shields part of a surface. Finishes within the sun path should be selected for light stability, and where veneer is used we avoid placing an unshielded run directly opposite full-height glazing.

Glare and screen positions

A television or monitor facing the window fights the view all afternoon. Either move the screen to a perpendicular wall, or plan blinds capable of cutting glare without killing the view. This is a layout decision that has to be made before the feature wall is drawn.

Curtain strategy

Sheer plus blackout in bedrooms, a single sheer layer plus a solar blind in living areas is a common resolution. Track and pocket details belong in the joinery drawing so nothing surface-mounted appears later.

Humidity and coastal air

Waterfront flats see high humidity and salt-laden air when windows are open. We keep ventilation gaps behind deep cabinets, specify hardware that resists corrosion, and advise against hanging damp garments in a closed wardrobe — the single fastest way to make new joinery smell old.

Materials, Finishes and Hardware

These are the line items that explain price gaps between quotations, so we quote them individually rather than as a lump sum.

  • Carcass board — grade and thickness, with lower-emission eco wood options where preferred
  • Back panel thickness — carries racking loads on tall units; where cheap cabinets reveal themselves
  • Door finish — laminate and melamine for durability, veneer for depth with batch matching, lacquer for a seamless look that needs professional respray to repair, fluted panels for texture at a higher running-foot cost
  • Light-stable finishes — specified where surfaces sit in the sun path of harbour-facing glazing
  • Moisture-rated substrate — for vanities, utility cabinets and anything near water
  • Hinges — soft-close with stated brand and cycle rating
  • Drawer runners — full-extension with stated load rating
  • Sliding gear — track quality decides whether doors still glide in year five
  • Handles and profiles — push-to-open, J-pull or inset metal trims, chosen against the developer's existing hardware finish
  • Internal fittings — trouser racks, pull-out baskets, dividers, in-cabinet LED with door sensor

Samples of these boards, laminates, veneers and hardware are kept at our Kwun Tong office, a short trip across the harbour from North Point.

Fit-Out Rules and Compliance

Premium managed developments enforce fit-out discipline, and the paperwork is not optional.

  • Works application — schedule, contractor details, insurance and a refundable deposit
  • Service lift booking — timed slots, with penalties for overrun in many developments
  • Protection standard — lift car, lobby, corridor and unit entrance protection before material enters
  • Permitted hours — noisy operations restricted, which shapes the installation sequence
  • Delivery route and waste — agreed route in and out, with packaging and offcuts removed rather than left in common refuse areas
  • Minor works — any alteration to partitions or structural elements falls under the Minor Works Control System and must be carried out by a prescribed registered contractor. D-8 Limited is a Registered Minor Works Contractor Class II; the regime is explained in our credentials section

Where a wider scope is involved, we handle these submissions as part of a Design & Build engagement, and structural repair sits under Spalling Repairing Works.

How a Handover Fit-Out Is Quoted

With no demolition and no wet trades, spend concentrates in three places: joinery, lighting, and curtains or blinds. Joinery is normally priced per cabinet or per running foot.

Compare line by line

  • Cabinet count and running length per piece, including the top box as a separate item
  • Board grade, back panel thickness and door finish per item
  • Hinge, runner and sliding gear brand with ratings
  • Internal fittings, in-cabinet lighting and power provision
  • Curtain pocket, track and treatment — inside or outside the quotation
  • Protection, lift booking, delivery, installation and waste removal
  • Warranty period and coverage

Phasing before move-in

If budget is staged, prioritise anything needing electrical coordination and anything behind a fixed position — the TV wall, the kitchen additions, the primary wardrobe. Secondary bedrooms and study joinery can follow later with minimal disruption. Our fee models and an 18-point quotation checklist are on the quotation page, with warning signs listed here.

Custom Furniture FAQ

Harbour Glory is at 32 City Garden Road, North Point, in the Eastern District of Hong Kong Island, on the Victoria Harbour waterfront about a block from Fortress Hill MTR station — roughly a five minute walk. Developed by CK Asset, with an occupation permit dated 11 June 2019. See the property section.
378 residential units across six residential towers, numbered 1 to 8 with 4 omitted and Tower 2 forming the hotel component. Blocks run 33 to 37 storeys with two to five units per floor, saleable areas 432 to 1,595 square feet, one to four bedroom layouts. The development also includes a hotel of roughly 330,000 square feet with about 800 rooms. Primary school net 14, secondary allocation Eastern District.
Almost no demolition, so budget shifts to joinery, lighting, curtains and soft furnishing. The constraints change: you build against finished floors, skirting, installed kitchens and installed appliances, all of which must be protected and matched rather than replaced. Working before move-in also avoids protection and furniture-shifting costs.
Complete the defects inspection and log every existing mark in writing with photographs before any contractor enters, so responsibility is never disputed. Avoid altering developer-installed services, and plan fixing positions away from concealed pipework. Full sequence in the handover fit-out sequence.
We record the floor finish, skirting profile, door and architrave finish, kitchen cabinet colour, worktop and sanitary ware, then either match the palette closely or contrast it deliberately. Half-matching is the outcome to avoid — a near-miss reads as an error, a clear contrast reads as a decision. See working with developer finishes.
Add a top box above the standard wardrobe height — the cheapest storage volume in any flat — plus a deeper curtain pocket, a concealed lighting cove and taller kitchen units. Anything above about 2,100 millimetres needs a step, so it should hold seasonal items. Details in making use of a taller ceiling.
Full-height storage on the single longest wall, an entrance shoe cabinet with a drop shelf, a TV feature wall concealing equipment, and either a platform bed with drawers or a wardrobe run with a top box. Sliding doors where the bed sits close. See joinery by unit size.
A walk-in closet or dressing room becomes viable, along with a utility and laundry cabinet, a study or library wall and a proper entrance drop zone. Long runs demand tighter tolerances and batch-matched finishes, since a two millimetre drift compounds visibly across a nine metre wardrobe.
Yes. Strong daylight fades veneer and some laminates unevenly, so finishes in the sun path should be light-stable, and blinds or curtains planned as part of the joinery. Screens facing the window fight glare all afternoon, so screen position belongs in the layout decision. See designing for a harbour-facing flat.
Expect a works application with schedule, contractor insurance and a refundable deposit, restricted working hours, timed service lift bookings, full protection of lifts and lobbies, controlled delivery routes and waste removal requirements. These shape the installation programme — see fit-out rules and compliance.
Pure joinery installation usually does not, but any alteration of partitions or structural elements falls under the Minor Works Control System and must be carried out by a prescribed registered contractor. D-8 Limited is a Registered Minor Works Contractor Class II — background in our credentials section.
Per cabinet or per running foot, driven by board grade, door finish, internal fittings and hardware. In a handover unit, joinery, lighting and curtains typically account for the bulk of the budget because no demolition or wet trades are involved. Compare with the 18-point checklist.
Design, drawings and finish approval usually run four to eight weeks with fabrication overlapping. On-site joinery installation in a typical apartment is measured in days rather than weeks, followed by curtains, adjustment and cleaning. Working before move-in shortens everything.
Send the floor plan with tower and flat letter, the ceiling height if known, and a list of what needs storing, then book a free site visit. We measure, discuss the brief and issue a written itemized quotation before any commitment. Call 9135 3998, email enquiry@designd8.com or use the quotation form.

Fitting Out Before You Move In?

That is the cheapest moment to do it. Free site visit, free measurement, written itemized quotation. Call 9135 3998 or email enquiry@designd8.com.

Get a Quote Custom Made Furniture
WhatsApp